This was too easy for the people who were on the Thunder Out West trip.
I hope everyone the that trip got a kick out of the stop at the Golden Gate Bridge.
Did you see my handiwork while you were there?
1. I designed the bicycle railing that goes between the roadway and the sidewalks.
2. I also designed the North Viaduct Seismic Retrofit (the bridge portion between the North Anchorage House and the North Abutment):
I hope everyone the that trip got a kick out of the stop at the Golden Gate Bridge.
Did you see my handiwork while you were there?
1. I designed the bicycle railing that goes between the roadway and the sidewalks.
2. I also designed the North Viaduct Seismic Retrofit (the bridge portion between the North Anchorage House and the North Abutment):
a. Replaced 3 support towers
b. Installed Lead-Rubber Seismic Isolator bearings between the tops of the new towers and the original bridge superstructure.
b. Installed Lead-Rubber Seismic Isolator bearings between the tops of the new towers and the original bridge superstructure.
Comment